Year: 2019
Client: Perez Piñana Arquitectes
Firms: Infraestructures | CatSalut | Ajuntament Sant Pere Ribes
BIM360 + REVIT
0%
navisworks
0%
POWER BI
0%
Video: Clashdetection Integration in POWERBIM
With the direct and interactive real-time linkage of the clashes and all their properties with the model components, as well as their grouping based on different criteria defined by a collision matrix, we are able to identify quickly and effectively the problems, as well as recording the evolution of these tests throughout the project process.