You are currently viewing Hospitales 4.0

Hospitales 4.0

Year: 2022
Promoters: MINISTERIO DE INDUSTRIA, COMERCIO Y TURISMO / PLAN DE RECUPERACIÓN, TRANSFORMACIÓN Y RESILIENCIA / NEXT GENERATION EU
Firms: Smartech Cluster / CT Solutions / Cluster de Salut Mental Catalunya / Consorci Sanitari de Terrassa / Universitat Politecnica de Catalunya / BIM6D

BIM
0%
POWERBIM
0%

Project explanation

As Alfonso Sanahuja, from Consorci Sanitari de Terrassa (Hospital in Terrassa) says:

Frederic Gil Banús, MEP and Smart Building Lead Engineer in BIM6D explains

Miguel Delgado, from Universitat Politecnica de Catalunya, explains:

HOSPITALES 4.0 benefits:

  • Reduction of maintenance costs, it is possible to predict the main temporary windows in which to carry out preventive maintenance and reduce the number of corrective maintenance actions.
  • Increase in the availability of resources, the mean time between failures is lengthened and the useful life of the equipment is also lengthened.
  • Consequence of the previous two: Greater efficiency, lower operating costs for greater availability of the operation.

Helena Perez, from CadTech Iberica says:

DigitalTwin as a Service

POWERBIM DigitalTwin has been the key as integrative platform for all the systems that have been part of the project, BIM data structuration and classification system on it has been the technology that organize the information, and simulation inputs and results the interactive database to be crossed with the model. But one of the more innovative capabilities of POWERBIM is to be able to create custom data analytics templates collecting the workflow in the project in order to automate it and show results of the simulations in a completely new way, also the ability to “Play” the simulation over the timeline to see, compare, analyse and help users to take decisions from data insights.

Enjoy the video for the POWERBIM result of the project !

Leave a Reply